Cold Pour Crack Filler
TA-300 S/M cold pour crackfiller is a blend of asphalt emulsion, suitable fillers, and is “Super Modified” with a blend of “three select polymers” for greater flexibility and adhesion in asphalt or concrete surfaces. TA-300 is available at many Graniterock branch locations.
PHYSICAL PROPERTIES
Cracks must be dry and clean of all loose foreign matter. Use of compressed air or water jet is recommended. Apply a suitable weed killer prior to crackfilling with TA-300 S/M.
APPLICATION
Mix TA-300 S/M thoroughly before using. Use as received from the container. For best results, apply TM-300 S/M with a pour pot or suitable crack sealing applicator. Fill cracks to the surface, scrape excess material using a “V” shaped rubber squeegee to minimize waste and maximize adhesion. Prior to TA-300 S/M curing, sprinkle silica sand (lightly) to promote adhesion of Poly-Kote TA-1000.
COVERAGE
Indefinite. For estimated purposes; up to 315 linear feet of ½″ × ½″ crack per 5 gallon pail. For bottomless cracks, fill with sand to ¾″ – 1″ of the pavement surface. (see chart on back)
CURE TIME
Depends on air temperature, humidity and width and depth of crack. For early pedestrian or vehicle traffic, cover TA-300 S/M with a dry “fine” sand.
CLEAN UP
Water may be used to clean TA-300 S/M from tools and equipment prior to drying. If dried, use a suitable solvent.
PACKAGING
53 gallon drum, 5 gallon pail.
PRECAUTIONS
TA-300 S/M shall not be applied during or when rain is imminent. Application temperature shall be 50°F and rising. Keep away from children. Protect from freezing.
Asphalt Calculator
PHYSICAL PROPERTIES
- TA-300 S/M meets or exceeds the following
- Specifications: ASTM D 2939
- Residue at 300–400°F: 60–70%
- Solubility of Residue in C2HC13: 85–95
- Firm Set: 90 Mins.
- Viscosity @ 77°F Brookfield, Spindle #3 @ 20 rpm: 300–700 cps
- Water resistance: PASS
- Flexibility: PASS
- Ash content of insoluble residue: 70% min.
- Surface Preparation
Cracks must be dry and clean of all loose foreign matter. Use of compressed air or water jet is recommended. Apply a suitable weed killer prior to crackfilling with TA-300 S/M.
APPLICATION
Mix TA-300 S/M thoroughly before using. Use as received from the container. For best results, apply TM-300 S/M with a pour pot or suitable crack sealing applicator. Fill cracks to the surface, scrape excess material using a “V” shaped rubber squeegee to minimize waste and maximize adhesion. Prior to TA-300 S/M curing, sprinkle silica sand (lightly) to promote adhesion of Poly-Kote TA-1000.
COVERAGE
Indefinite. For estimated purposes; up to 315 linear feet of ½″ × ½″ crack per 5 gallon pail. For bottomless cracks, fill with sand to ¾″ – 1″ of the pavement surface. (see chart on back)
CURE TIME
Depends on air temperature, humidity and width and depth of crack. For early pedestrian or vehicle traffic, cover TA-300 S/M with a dry “fine” sand.
CLEAN UP
Water may be used to clean TA-300 S/M from tools and equipment prior to drying. If dried, use a suitable solvent.
PACKAGING
53 gallon drum, 5 gallon pail.
PRECAUTIONS
TA-300 S/M shall not be applied during or when rain is imminent. Application temperature shall be 50°F and rising. Keep away from children. Protect from freezing.
TA-300 S/M Cold Pour Crack Filler - Approximate Coverage Per 5 Gallon Pail
Inches | ¼ | ½ | ¾ | 1 | 1 ¼ | 1 ½ | 1 ¾ | 2 |
---|---|---|---|---|---|---|---|---|
¼ | 1200 | 600 | 375 | 300 | 240 | 200 | 172 | 150 |
½ | 600 | 315 | 200 | 150 | 120 | 100 | 86 | 75 |
¾ | 375 | 200 | 137 | 100 | 81 | 67 | 59 | 75 |
1 | 300 | 150 | 100 | 75 | 61 | 51 | 44 | 39 |
1 ¼ | 240 | 150 | 81 | 61 | 49 | 41 | 35 | 31 |
1 ½ | 200 | 100 | 67 | 51 | 41 | 34 | 29 | 26 |
1 ¾ | 172 | 86 | 59 | 44 | 35 | 29 | 25 | 22 |
2 | 150 | 75 | 51 | 39 | 31 | 26 | 22 | 19 |