Projects

Menlo Park School Retention System

Job Owner: Menlo Park School District
Location: Atherton/Menlo Park

Graniterock crews excavated for a retention system with three 48″ HDPE pipes that were 160′. Graniterock also used an excavator with a hopper and conveyor belt on the back to backfill the area. The project site was narrow so it was impossible to use a loader to backfill everything.